Industrial design review · Production guide

Annotate an exploded product view from an existing CAD model

Four Pivot 01 components separated vertically in assembly order
Original study · Four Pivot 01 components separated vertically in assembly order

The source model names B01 base, H01 hinge, A01 arm and L01 head. Separate these four named objects vertically for the explanation; retain a solid assembled view beside it.

Input and decision

Open the assembled model and make a list of the four object names before laying out the exploded view. Assign one number to each real source object. Pivot 01 is an original presentation model. Material and mechanical approval require their own evidence.

Set up the comparison

Compare the apparent order of the separated view to the assembled source. An assembly diagram can explain relationships even when it supplies no install tolerances.

Make the comparison

Trace each leader to a named OBJ object. Keep the assembled view beside the exploded one so the reviewer can find the same hinge before it is offset.

Worked record

The downloadable worksheet includes the records below and a blank row for your own project.

Filled review record
CalloutOBJ objectAssembled locationIllustrated offsetRevision
1B01_BASELowest component0 mmStudy 01
2H01_HINGEAt arm pivot'+20 mm in exploded drawingStudy 01
3A01_ARMRotates about source pivot'+56 mm in exploded drawingStudy 01
4L01_HEADAt the far end of the arm91 mm up in the exploded drawingStudy 01

Check the result

Reject a callout with no matching source object. The exploded distance is for legibility and must not be interpreted as a clearance.

Hand off the revision

Package the assembled model with the exploded view and part names. Mark the drawing offsets as illustration values.

Review question

Does the 20 mm hinge offset represent real assembly clearance?

The 20 mm is a display offset in the exploded drawing. Find H01_HINGE in the assembled source to recover its true modeled location. Actual clearance requires a separate engineering check.

Use the task on your own brief

Use a copy of the worksheet to keep the project’s source files, reviewed options and decisions together.