Interior concept review · Production guide
Connect an interior finish schedule to a client presentation board
Use C01-O on the oak view and C01-S on the stone view. Both map to service counter C01. F01 and W01 each retain one approved or pending entry in the register.
Input and decision
Find C01 in the source register, then locate every board and view that names C01-O or C01-S. Treat suppliers' final identifiers as controlled fields. Corner Room is a fictional original model. Its geometry is a discussion reference for this exercise.
Set up the comparison
When substituting stone for oak, change the option row and create a revised render together. F01 floor and W01 wall should retain their existing codes.
Make the comparison
Search the finish register for the old C01-O code and list its drawings before making substitutions. Reopen each exported view after the change.
Worked record
The downloadable worksheet includes the records below and a blank row for your own project.
| Old code | New code | Surfaces | Revised files | Confirmation |
|---|---|---|---|---|
| C01-O | C01-S | Service counter | Counter views A and B | Physical sample pending |
| F01 | F01 | Floor | All views | Unchanged |
| W01 | W01 | Rear wall | All views | Unchanged |
Check the result
Replace one finish in the table and identify every image or note carrying the superseded code before distributing the revision.
Hand off the revision
Deliver the revised finish register with a checklist of replaced exports. Ask the client to acknowledge the same new code in both.
Review question
What should travel with a revised counter-finish code?
Put the old code, new code, affected surfaces, exports and confirmation on the same change row. Here C01 changes while F01 and W01 stay fixed.
Use the task on your own brief
Use a copy of the worksheet to keep the project’s source files, reviewed options and decisions together.